Philippines Industrial Park Circulating Water Cooling Project
Customer: Industrial Park Operator
Location: Philippines
Equipment: Closed-Circuit Cooling Tower
Cooling Medium: Recirculating Clean Water
Quantity: 9 Units
A large industrial park located in a tropical coastal region of the Philippines required a reliable circulating water cooling solution for multiple manufacturing facilities. The cooling system serves both central air-conditioning systems and process cooling equipment. Due to the region’s high temperatures, humidity, and salt-laden coastal air, the customer required a corrosion-resistant, low-maintenance solution capable of delivering stable performance year-round.
![]()
Challenge
The customer previously operated conventional open cooling towers that suffered from excessive drift loss, unstable outlet water temperatures, and frequent maintenance issues.
Key challenges included:
High ambient temperatures ranging from 32°C to 38°C year-round
Severe coastal salt-spray corrosion
Significant water consumption caused by drift losses
Unstable cooling performance during peak summer operation
Need for standardized equipment across multiple workshops
Limited local maintenance resources
The customer sought a durable and energy-efficient cooling solution that could ensure reliable operation under tropical coastal conditions while minimizing operating costs.
Solution
CASEN supplied nine Closed-Circuit Cooling Towers specifically configured for the local operating environment.
Key design features included:
Enhanced Corrosion Protection
Magnesium-aluminum-zinc coated heat exchange coils
Additional anti-corrosion protective coating on the tower casing
Designed for long-term resistance to coastal salt-spray exposure
Water-Saving Design
High-efficiency drift eliminators
Drift loss controlled below 0.001%
Reduced water consumption and makeup water demand
Intelligent Capacity Control
Nine towers arranged into three modular operating groups
Variable Frequency Drive (VFD) fan control
Automatic cooling capacity adjustment based on thermal load
Simplified Installation & Commissioning
Containerized export packaging
Complete English installation manuals and drawings
Remote commissioning support for local contractors
Reliability Verification
48-hour continuous full-load factory performance testing
Simulated high-temperature and high-humidity operating conditions
Results
All nine cooling towers were successfully commissioned on schedule and entered continuous operation without issue.
After 18 months of operation, the customer achieved:
24/7 stable cooling performance throughout the year
Zero coil corrosion failures or leakage incidents
34% reduction in cooling water consumption
17% improvement in HVAC cooling efficiency during peak summer operation
40% reduction in local maintenance workload
The successful project led to additional discussions regarding cooling equipment supply for future industrial park expansion phases.
Key Performance Indicators
| Item | Result |
| Quantity Supplied | 9 Units |
| Maximum Ambient Temperature | 38% |
| Corrosion-Free Operation | 18 Months |
| Water Savings | 34% |
| HVAC Efficiency Improvement | 17% |
| Maintenance Cost Reduction | 40% |
Project Highlights
Standardized anti-corrosion cooling tower solution for Southeast Asian coastal environments
Modular multi-unit cooling system with intelligent VFD control
Proven long-term performance under high-temperature, high-humidity, and salt-spray conditions
Remote overseas commissioning and technical support services
![]()